A finish built to hold up through Guelph's humid summers and freeze-thaw winters.
Get a Free QuoteGuelph's climate is hard on exterior paint: humid summers followed by hard freeze-thaw winters shorten the life of a paint film that wasn't properly prepped. Scraping loose paint, sanding, spot-priming bare wood, and caulking gaps before painting is what actually determines how long the job lasts β not the number of coats.
May through September is the practical painting window in Guelph; temperature and humidity outside that range affect how paint cures.
Older homes downtown built before 1980 may have lead-based paint under later coats β an operator following safe work practices will account for this during prep on affected properties.
One local operator. Written quote. No obligation.